DOM

manufacturer
per page
View as List Grid

9 Items

Set Descending Direction
  1. DOM DOM ENiQ® Pro V2 DOM ENiQ® Pro V2 half cylinder factory profile
    Delivery Time: approx. 10 business days

    Features:

    • electronic half cylinder from 30/10 mm
    • single-sided reading
    • with patent protection
    • highest protection class (VdS BZ+)
    Learn More
  2. DOM rs Sirius® DOM rs Sirius half cylinder factory profile
    Delivery Time: 4 - 5 weeks

    Features:

    • nickel silver serrated key
    • technical key copy protection "starline"
    • high-grade drilling and pulling protection
    • certified according to DIN EN 1303 160B0C6C
    • certified according to SKG**
    Learn More
  3. DOM ix Teco® (7TE) DOM ix Teco® (7TE) half cylinder proprietary profile with production at the manufactor
    Delivery Time: 2 - 3 weeks

    Features:

    • reversible key with special high-low milling
    • with additional stamped recess
    • very high key copy protection
    • cylinder body: brass, dull nickel
    • optional modular design
    Learn More
  4. DOM ix TwinStar 2-in-1 DOM ix TwinStar half cylinder 2-in-1 factory profile
    Delivery Time: 2 - 3 weeks

    Features:

    • reversible key with patented movable double roller
    • 2-in-1 system
    • very high key copy protection
    • drilling protection according to VdS B
    • cylinder made of solid brass, dull nickel
    Learn More
  5. DOM RS 8 DOM RS 8 half cylinder factory profile
    Delivery Time: 3 - 4 weeks

    Features:

    • serrated key with rib on the side
    • very high key copy protection
    • drilling protection according to VdS B+
    • solid brass cylinder, dull nickel
    Learn More
  6. DOM ix TwinStar DOM ix TwinStar half cylinder factory profile
    Delivery Time: 2 - 3 weeks

    Features:

    • reversible key with patented movable double roller
    • very high key copy protection
    • drilling protection according to VdS B+
    • cylinder made of solid brass, dull nickel
    Learn More
  7. DOM diamant DOM diamant half cylinder factory profile
    Delivery Time: 8 - 14 business days

    Features:

    • modular construction with chrome-nickel-steel connecting bar
    • drilling protection according to VdS BZ+
    • highest key copy protection
    • cylinder body: steel/duracast
    Learn More
  8. DOM ix TwinStar DOM ix TwinStar half cylinder EXPRESS factory profile
    Delivery Time: 5 - 7 business days

    Features:

    • express delivery
    • reversible key with patented movable double roller
    • very high key copy protection
    • drilling protection according to VdS B+
    • cylinder made of solid brass, dull nickel
    Learn More
  9. DOM RS 8 DOM RS 8 half cylinder EXPRESS factory profile
    Delivery Time: 5 - 7 business days

    Features:

    • express delivery
    • serrated key with rib on the side
    • very high key copy protection
    • drilling protection according to VdS B+
    • solid brass cylinder, dull nickel
    Learn More
per page
View as List Grid

9 Items

Set Descending Direction